Before
Before
After
After
  • 大图
  • 大图
  • 大图
  • 大图
  • 大图
  • 大图
  • 大图
  • 大图
  • 大图
  • 大图
  • 大图
  • 大图
  • 大图
  • 大图
  • 大图
  • 大图
  • 大图
  • 大图
  • 大图
  • 大图

Construction Photos - Forest Hill

Project Address: Forest Hills
Project Footage: 700 SF
Project Scope: Remove existing and provide a new kitchen; remove and refinish entire bathroom with new fixtures and tiles; shorten the linen closet in front and bathroom and upgrade the closet near entry with a sliding door; re-polish wood floor; Paint entire apartment; Adding lights at living room/dining room areas; Install new doors for bathroom, living room and closets; Change the floor moldings;Removed wall between kitchen and dining room.